Projects: Technical and Financial Feasibility Study (14)

Consultancy Services for Pre-Feasibility and Feasibility Study of Madhumati 100MW HFO Based Power Plant Project

August 2017 – November 2017

Technical and Financial Feasibility Study; Design and Drawings of Electrical Distribution Network; Design and Drawings of Gas Transmission Network - of Jolshiri Abashon Project

August 2018 – December 2020

Project Profile and Feasibility Study of a 5 MW Biomass Power Plant Project

June 2022 – September 2022

Load Factor Analysis Consultant for 660MW Combined Cycle Gas Turbine Power Plant in Bangladesh

May 2023 – August 2023

Feasibility Study for Electrical Interconnection Facility (EIF) and Gas Transportation Facility (GTF)

January 2023 – October 2023

In-depth Monitoring of the “Construction of Narshingdi District Jail” Project. (Package: SR-25)

February 2023 – June 2023

Consultancy Services as Consultant (Energy) for Preparation of Mithamoin and Atpara Upazila (Package No.: UTMIDP/UMPP-1) Master Plan under "Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)”, LGED.

November 2023 - Ongoing

Consultancy Services as Consultant (Energy) for Preparation of Monoharganj, Lalmai and Gowainghat Upazila (Package No.: UTMIDP/UMPP-2) Master Plan under "Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)", LGED.

November 2023 - Ongoing

In-depth Monitoring of the “Construction of 34 nos. Buffer Godown at Different Places of the Country for Facilitating Fertilizer Reservation and Distribution (1st Revised)” Project. (Package No.SR-27)

December 2023 – June 2024

In-depth Monitoring of the "Development of Bhola (Parantalukdarhat)-Charfashan (Charmanika) Regional Highway" project

December 2023 – June 2024

Detail Technical & Financial Feasibility Study (Part B) for Enhancement and Strengthening of Power Distribution System of Cumilla and Mymensingh Zone, BPDB

June 2024 – Ongoing

Consultancy Services as Consultant (Energy) of “Review & Update of Nawabganj Upazila (Package No.: UTMIDP/UMPR-2) Development Plan (Master Plan) under “Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)”, LGED

November 2024 - Ongoing

In-depth Monitoring of “Upgradation of Kushtia (Trimohani)-Meherpur-Chuadanga-Jhenaidah (R-745) Regional Highway from Kushtia to Meherpur to proper standard and width (1st Revised)” project.

November 2024 – June 2025

In-depth Monitoring of the Construction of Commercial Building near KDA Market (1st Revised) (Package No. SR-43)

November 2024 – June 2025