Grid Impact Study for Pabna 60MW Solar Park Project of Bangladesh China Renewable Energy Company (Pvt.) Limited (BCRECL)

Duration: December 2024 – July 2025
Location: Pabna, Bangladesh
Client: ParyOcean (Asia Pacific) International Co., Ltd. [EPC Contractor of the Project]
Technical Services of System Study for Grid Integration of Pabna 60MW Solar Park Project as per the following Scope of Services: “A Detailed Grid Impact Study including Voltage Control, Frequency Control, Reactive Power Compensation, Harmonic Compensation, Fault RideThrough Control, Active Power Curtailment, Short Circuit Study, etc. complying with Electricity Grid Code,PPA And IA Requirements.”