Owner’s Engineer Services for Madhumati 100MW HFO Based Power Plant Project (including 132kV Single Circuit Transmission Line)

February 2018 – May 2019

Owner’s Engineering Services for Teesta 200 MW AC Solar PV Project

October 2021 – April 2023

Owner’s Engineer of Sirajganj 68 MW Solar Park Project

October 2022 – July 2024

Consultancy Services for Design and Supervision of Power Network and Gas Network for Bangabandhu Sheikh Mujib Shilpa Nagar (BSMSN) Development Project, BEZA

June 2023 – January 2024

Owner’s Engineer of Pabna 60 MW Solar Park Project

January 2024 – Ongoing

Consultancy Services for Pre-Feasibility and Feasibility Study of Madhumati 100MW HFO Based Power Plant Project

August 2017 – November 2017

Technical and Financial Feasibility Study; Design and Drawings of Electrical Distribution Network; Design and Drawings of Gas Transmission Network - of Jolshiri Abashon Project

August 2018 – December 2020

Project Profile and Feasibility Study of a 5 MW Biomass Power Plant Project

June 2022 – September 2022

Load Factor Analysis Consultant for 660MW Combined Cycle Gas Turbine Power Plant in Bangladesh

May 2023 – August 2023

Feasibility Study for Electrical Interconnection Facility (EIF) and Gas Transportation Facility (GTF)

January 2023 – October 2023

In-depth Monitoring of the “Construction of Narshingdi District Jail” Project. (Package: SR-25)

February 2023 – June 2023

Consultancy Services as Consultant (Energy) for Preparation of Mithamoin and Atpara Upazila (Package No.: UTMIDP/UMPP-1) Master Plan under "Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)”, LGED.

November 2023 - Ongoing

Consultancy Services as Consultant (Energy) for Preparation of Monoharganj, Lalmai and Gowainghat Upazila (Package No.: UTMIDP/UMPP-2) Master Plan under "Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)", LGED.

November 2023 - Ongoing

In-depth Monitoring of the “Construction of 34 nos. Buffer Godown at Different Places of the Country for Facilitating Fertilizer Reservation and Distribution (1st Revised)” Project. (Package No.SR-27)

December 2023 – June 2024

In-depth Monitoring of the "Development of Bhola (Parantalukdarhat)-Charfashan (Charmanika) Regional Highway" project

December 2023 – June 2024

Detail Technical & Financial Feasibility Study (Part B) for Enhancement and Strengthening of Power Distribution System of Cumilla and Mymensingh Zone, BPDB

June 2024 – Ongoing

Consultancy Services as Consultant (Energy) of “Review & Update of Nawabganj Upazila (Package No.: UTMIDP/UMPR-2) Development Plan (Master Plan) under “Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)”, LGED

November 2024 - Ongoing

In-depth Monitoring of “Upgradation of Kushtia (Trimohani)-Meherpur-Chuadanga-Jhenaidah (R-745) Regional Highway from Kushtia to Meherpur to proper standard and width (1st Revised)” project.

November 2024 – June 2025

In-depth Monitoring of the Construction of Commercial Building near KDA Market (1st Revised) (Package No. SR-43)

November 2024 – June 2025

Grid Interconnections Study for proposed 1200MW RLNG Based Combined Cycle Power Plant Project as IPP.

February 2019 – March 2020 (Intermittent)

Grid Interconnection Study of Patuakhali 1320MW Coal Based Power Plant Project of RNPL

July 2019 – October 2020 (Intermittent)

Grid Study for the proposed 50MW Solar Power Plant Project of Scatec Solar ASA, Norway

May 2020 – July 2020

Grid Impact Study for Cox’s Bazar 60MW Wind Power Plant Project

September 2022 – May 2023

Grid Impact Study for Sirajganj 68MW Solar Park Project of Bangladesh China Renewable Energy Company (Pvt.) Limited (BCRECL)

July 2023 – May 2024

Grid Impact Study for Pabna 60MW Solar Park Project of Bangladesh China Renewable Energy Company (Pvt.) Limited (BCRECL)

December 2024 – July 2025

Technical and Financial Due Diligence for 576kW, 224kW, 324kW Rooftop Solar Power Plants respectively at Raz Cold Storage, Zayeda Cold Storage and Sarkar Cold Storage of Sarkar Group

March 2023 – August 2023

Preparation of Project Profile for Sarkar Brick & Block

October 2023 – November 2023

Site Assessment for Renewable Power Plants

November 2022 – January 2023

Technical Due Diligence on Solar project portfolio in Bangladesh

January 2024 – April 2024

Technical Due Diligence on Solar C&I Rooftop Project Portfolio

January 2024 – April 2024

Environmental Impact Assessment at Emon Fashion Limited

April 2022 – May 2022

Environmental Impact Assessment at Masco Exports Limited

May 2022 – June 2022

Environmental Impact Assessment and Hazard Identification and Risk Assessment at Tarasima Apparels Limited

July 2022 – September 2022

Environmental Impact Assessment and Hazard Identification and Risk Assessment at Cutting Edge Industries Limited

August 2022 – September 2022

Environmental Impact Assessment and Hazard Identification and Risk Assessment at APS Apparels (Dyeing Unit) Ltd.

August 2022 - November 2022

Environmental Impact Assessment and Hazard Identification and Risk Assessment at Scandex Textile Industries Limited

February 2023 – April 2023

Environmental Impact Assessment at Denitex Ltd.

March 2023 – May 2023

Investment Grade Energy Audit at Dekko Ready wears Limited

May 2017 – June 2017

Energy Efficiency Audit at Rahman Chemicals Limited

June 2017 – July 2017

Energy Efficiency Audit at Charu Ceramic Industries Limited

August 2017 – September 2017

Energy Efficiency Audit at SARZAN Textile Mills Limited

42979

Investment Grade Energy Audit at Globus Garments Limited

September 2017 – October 2017

Investment Grade Energy Audit at Agami Fashions Limited and Agami Washing Limited

November 2017 – December 2017

Investment Grade Energy Audit at Dekko Design Limited and Dekko Washing Limited

December 2018 – January 2019

Investment Grade Energy Audit at Cotton Clothing (BD) Limited

December 2018 – January 2019

Investment Grade Energy Audit at Apparel Promoters Limited

April 2019 – May 2019

Investment Grade Energy Audit at Radiance Knitwears Limited

August 2019 - September 2019

Investment Grade Energy Audit at Smart Jacket (BD) Limited & Shehan Specialized Textile Mills Limited

November 2019 – December 2019

Investment Grade Energy Audit at APS Holdings Limited

43831

Investment Grade Energy Audit at Active Composite Mills Limited

June 2020 – July 2020

Investment Grade Energy Audit at Odessa Fashion Limited and Odessa Fashion Limited (Unit-2)

December 2020 – February 2021

Investment Grade Energy Audit at Meditex Industries Limited and Meditex Knitwear Limited

December 2020 – February 2021

Investment Grade Energy Audit at Space Sweater Limited

December 2020 – February 2021

Investment Grade Energy Audit at Titas Sweater Industries Limited and Titas Sweater (Knitting Unit)

December 2020 – February 2021

Technical Assessment on Improvement of Production Line Efficiency by Installing Automatic Data Processing Devices (ADPD) at Snowtex Outerwear Limited

February 2022-April 2022

Green Supplier Programme: Energy Efficiency Assessment and Improvement Recommendations for IFS Texwear (Pvt.) Limited

February 2022 – July 2022

Green Supplier Programme: Energy Efficiency Assessment and Improvement Recommendations for Seasons Dresses Limited

February 2022 – July 2022

Green Supplier Programme: Energy Efficiency Assessment and Improvement Recommendations for Mayc’s Garments Limited

February 2022 – July 2022

Green Supplier Programme: Energy Efficiency Assessment and Improvement Recommendations for Amena (Pvt) Limited

February 2022 – July 2022

Energy Efficiency Assessment at Emon Fashion Ltd.

44713

Energy Efficiency Assessment at Pacific Blue (Jeans Wear) Ltd.

44713

Energy Efficiency at Tarasima Apparels Limited

August 2022 – September 2022

Energy Efficiency Assessment for at Remi Holdings Limited.

September 2022-December 2022

Energy Efficiency Assessment for at Baridhi Apparels Limited.

September 2022-December-2022

Energy Efficiency Assessment at Echoknits Ltd.

January 2023-February 2023

Energy Efficiency Assessment at Denitex Ltd

March 2023 – May 2023

Energy Efficiency Assessment at Green Smart Shirts Ltd.`

April 2023 – May 2023

Energy Efficiency Assessment at Global Labels (Bangladesh) Ltd.

February 2023 – March 2023

Energy Efficiency Assessment at Al-Muslim Washing Ltd. at Al-Muslim Washing Ltd.

August 2023 – September 2023

Energy Efficiency Assessment at Nice spinning Mills Ltd.

July 2023 – August 2023

Energy Efficiency Assessment at Formula 1 Spinning Ltd.

September 2023 - October 2023

Energy Efficiency Assessment for the 425.7kWp Rooftop PV Solar Power Plant at Ananta Garments Ltd.

September 2023 - October 2023

Energy Efficiency Assessment at Echotex Ltd.

September 2023 to October 2023

Energy Efficiency Assessment for Baraka Patenga Power Ltd.

December 2023 to January 2024

Energy Efficiency Assessment for Color City Ltd (DBL Group)

December 2023 to January 2024

Energy Efficiency Assessment for Flamingo Fashion Ltd (DBL Group)

December 2023 to January 2024

Energy Efficiency Assessment for Ananta Garments Ltd.

December 2023 to January 2024

Energy Efficiency Assessment for Ananta Jeanswear Ltd.

December 2023 to January 2024

Energy Efficiency Assessment for the 334.02kWp Rooftop PV Solar Power for Ananta Jeanswear Ltd.

December 2023 to January 2024

Energy Efficiency Assessment for the 1.20MWp Rooftop PV Solar Power at Echotex Ltd.

January 2024 to March 2024

Energy Efficiency Assessment for Kazi Polymer Ltd.

January 2024 to March 2024

Energy Efficiency Assessment for the 1686.09kWp Rooftop PV Solar Power of Fakir Fashion Ltd.

March 2024 to April 2024

Energy Efficiency Assessment for Pacific Blue Jeanswear Ltd.

May 2024 to June 2024

Energy Efficiency Assessment for the 123.715kWp Rooftop PV Solar Power of Knit Asia Ltd Unit 1

May 2024 to June 2024

Energy Efficiency Assessment for the 559.170kWp Rooftop PV Solar Power of Knit Asia Ltd Unit-2

May 2024 to June 2024

Energy Efficiency Assessment of Square Textiles PLC

June 2024 to ongoing

Energy Efficiency Assessment for the 1147.41kWp Rooftop PV Solar Power Plant at Habitus Fashion Ltd.

May 2024 to June 2024

Energy Efficiency Assessment for the 1,582.32 KWp Rooftop PV Solar Power Plant at Sharmin Apparels Ltd.

June 2024 to August 2024

Energy Efficiency Assessment of Echoknits Ltd.

June 2024 to August 2024

Energy Efficiency Assessment of Tusuka Processing Ltd.

August 2024 to October 2024

Energy Efficiency Assessment for the 1,123.40 KWp Rooftop PV Solar Power Plant at Artistic Design Ltd.

August 2024 to October 2024

Energy Efficiency Assessment for the 1,465.90 KWp Rooftop PV Solar Power Plant at Apparel Gallery Ltd.

August 2024 to October 2024

Energy Efficiency Assessment for the 2,654.375 KWp Rooftop PV Solar Power Plant at Creative Collections Ltd.

August 2024 to October 2024

Energy Efficiency Assessment for the 246.6 KWp Rooftop PV Solar Power Plant at Casual Garments Ltd.

August 2024 to October 2024

Energy Efficiency Assessment for the 705.55 KWp Rooftop PV Solar Power Plant at Explore Garments Ltd.

August 2024 to October 2024

Energy Efficiency Assessment for the 4425.625 KWp Rooftop PV Solar Power Plant at Ha-Meem Design Ltd.

August 2024 to October 2024

Energy Efficiency Assessment for the 650.75 KWp Rooftop PV Solar Power Plant at Next Collections Ltd.

August 2024 to October 2024

Energy Efficiency Assessment for the 369.90 KWp Rooftop PV Solar Power Plant at Refat Garments Ltd.

August 2024 to October 2024

Energy Efficiency Assessment for the 232.90 KWp Rooftop PV Solar Power Plant at That’s It Fashion Ltd.

August 2024 to October 2024

Energy Efficiency Assessment for the 369.90 KWp Rooftop PV Solar Power Plant at That’s it knit Ltd.

August 2024 to October 2024

Energy Efficiency Assessment of GoodEarth Apparels Ltd.

August 2024 to November 2024

Energy Efficiency Assessment for the 1009.8 KWp Rooftop PV Solar Power Plant at GoodEarth Apparels Ltd.

August 2024 to November 2024

Energy Efficiency Assessment of Echoknits Ltd. GTF

August 2024 to November 2024

Energy Efficiency Assessment for the 241.875 KWp Rooftop PV Solar Power Plant at Karim Textiles Ltd.

August 2024 to November 2024

Energy Efficiency Assessment for the 366.3 KWp Rooftop PV Solar Power Plant at Azim & Son (Pvt) Ltd. (Unit-02)

August 2024 to November 2024

Energy Efficiency Assessment for the 803.25 KWp Rooftop PV Solar Power Plant at BIDI Apparels Ltd

September 2024 to October 2024

Energy Efficiency Assessment of Indesore Sweater Ltd.

November 2024 to December 2024

Energy Efficiency Assessment of BSRM Ltd.

December 2024 to January 2025

Energy Efficiency Assessment of BSRM Ltd.

December 2024 to January 2025

Energy Efficiency Assessment for the 3281.525 KWp Rooftop PV Solar Power Plant at BSRM Wires Ltd.

December 2024 to January 2025

Electrical Safety Audit at RFL Electronic Limited – DIP Project

September 2017 – October 2017

Electrical Safety Audit at Arif Knitspin Limited and, NRG Hometex Limited

September 2017 – October 2017

Electrical and Fire Safety Assessment at Active Distribution Ltd., Apex Husain Limited and East Asian Cox. (Pvt.) Ltd.

March 2021 – April 2021

Electrical System Design of Mayble & Frank Fashion Limited

April 2017 – October 2017

Electrical System Design of Rawshan Jahan Eastern Medical College and Hospital

October 2017 – December 2017

Firefighting System Design of Well Spinners Limited

February 2018 – March 2018

Mechanical, Electrical & Plumbing System Design of Sufi Bari Resort

February 2018 – March 2018

Electrical System Design of Icon Tower of Rancon Developments Limited

June 2018 – August 2018

Electrical System Design of the Cumilla Hospital (12 Storied Diagnostic & Hospital Building)

June 2018 – September 2018

Electrical System Design of Conference Hall and Gymnasium Buildings of UNHCR, Cox’s Bazar

November 2018 – December 2018

Electrical System Design of Needle Drop Limited

February 2019 – May 2019

Mechanical, Electrical & Firefighting System Design of Concept Knitting Limited

February 2019 – December 2019

Mechanical and Electrical System Design of Eco Laundry Limited

March 2019 – December 2019

Electrical System Design of Old Dhaka Central Jail Museum (Zone B & Zone C) Project

March 2019 – December 2019

Electrical and Plumbing System Design of Barendra Vita Project of Sarkar Builders

January 2020 – February 2020

As-Built Design of Electrical System and proposed LPS and Earthing System Design and Firefighting Design of Active Distribution Ltd., Apex Husain Limited and East Asian Cox. (Pvt.) Ltd.

March 2021 – April 2021

Electrical, Firefighting and Plumbing System Design of Aemal Center of Sarkar Builders